This TWiki page is the main resource page for the WMKO PSF Reconstruction project as well as a resource page for past and current AO PSF reconstruction efforts. If you are working in the field of PSF reconstruction, we encourage you to register and edit a section in this page.
The proposal outlines three major phases of the project, described in roughly chronological order as:
PSF reconstruction working notes (2008-04-25) - this is a technical document containing aspects of mathematical modeling, analysis and simulations. Individual sections on component modeling can be accessed in the table below:
Phase 1 final report (PDF, PS). This is the final version of the technical draft linked above.
The IDL codes written for the PSF reconstruction are available upon request. Section 7 "Numerical Computation" in the Phase 1 report contains a brief description of the current set of codes and some instructions on how to use them. One reason why we do not simply make them available here is that some of it is specific to Keck and relies on certain directory structures and pre-compiled non-standard IDL packages. Anyone interested in the codes are asked to contact Chris Neyman at WMKO (cneyman_at_keck.hawaii.edu).
| Purpose | Type | Date | Remarks |
|---|---|---|---|
| Noise model validation | NIRC2, WFC data on simulation source | 2007-12-10 | 2h - Collected data for range of frame rate, SNR and gains |
| r0 Estimation | NIRC2, ACAM and WFC open and closed loops on bright stars | 2008-01-14 | 3h - Good conditions |
| NGS bright star, on-axis reconstruction | NIRC2, ACAM, and WFC (see night summary) | 2008-04-22 | 2h - Bad conditions |
| Noise model validation | NIRC2, WFC data on simulation source | 2008-04-28 | 2h - Setup: 1kHz, 70cts/subap, 1% SND, Br gamma - Investigated range of DTT, DM and centroid gain and NIRC2 setup |
| Noise model validation | NIRC2, WFC data on simulation source | 2008-05-06 | 2h - Same setup (+ Jcont and Hcont) - Sampled range of DTT, DM and centroid gain using automated script |
| NGS bright star, on-axis | NIRC2 and WFC | 2008-07-17 | 3h - Bad seeing (1-2 arcsec) for most of time - 30 min of decent data with various values for gain centroid, DTT and DM gains |
| NGS bright star, on-axis+anisoplanatism | NIRC2 and WFC | 2008-08-11 | 2h30 of good data - Bright and faint stars with variations of DM, DTT and centroid gains in narrow band H cont and Br gamma . Also, data on M15 with AO guide star R~ 12mag - all in NIRC2 narrow field |
| LGS bright star, on-axis+anisoplanatism?? | NIRC2 and WFC | 2008-09-16 | 3h allocated |
| Name | Institution | |
|---|---|---|
| Chris Neyman | W. M. Keck Observatory | cneyman_at_keck.hawaii.edu |
| David Le Mignant | W. M. Keck Observatory | davidl_at_keck.hawaii.edu |
| Don Gavel | UC Santa Cruz | gavel_at_ucolick.org |
| Brent Ellerbroek | Thirty Meter Telescope | brente_at_caltech.edu |
| Jean-Pierre Véran | Herzberg Institute of Astrophysics | Jean-Pierre.Veran_at_nrc-cnrc.gc.ca |
| I | Attachment | Action | Size | Date | Who | Comment |
|---|---|---|---|---|---|---|
| | CfAOY9LeMignant_v3nobudget.pdf | manage | 653.5 K | 27 Sep 2007 - 15:40 | DavidLM | |
| | fdom.pdf | manage | 192.7 K | 25 Oct 2007 - 05:21 | RalfFlicker | Appendix 1 |
| | PSFrec_cfao021107.pdf | manage | 1625.0 K | 05 Nov 2007 - 21:38 | RalfFlicker | Presentation 2007 CfAO? Fall Retreat |
| | otf.pdf | manage | 87.9 K | 17 Apr 2008 - 04:16 | RalfFlicker | OTF calculation |
| | fitting.pdf | manage | 637.8 K | 18 Apr 2008 - 04:08 | RalfFlicker | Fitting error model |
| | aliasing.pdf | manage | 88.2 K | 18 Apr 2008 - 04:22 | RalfFlicker | Aliasing model |
| | aniso.pdf | manage | 236.7 K | 18 Apr 2008 - 23:19 | RalfFlicker | Anisoplanatism model |
| | covx.pdf | manage | 142.0 K | 22 Apr 2008 - 01:51 | RalfFlicker | Covariance matrix modeling |
| | noise.pdf | manage | 46.7 K | 25 Apr 2008 - 23:24 | RalfFlicker | Noise model |
| | psf.pdf | manage | 810.6 K | 26 Apr 2008 - 02:43 | RalfFlicker | Working notes |
| | CfAO_Y9_Report_LeMignant.pdf | manage | 79.1 K | 30 Apr 2008 - 22:47 | DavidLM | |
| | PSF_Y9_Review-2.pdf | manage | 53.2 K | 28 Jul 2008 - 19:33 | DavidLM | |
| | psf_rev.ps | manage | 2979.9 K | 31 Oct 2008 - 21:27 | RalfFlicker | Phase 1 Final Report |
| | psf_rev.pdf | manage | 777.9 K | 01 Nov 2008 - 00:16 | RalfFlicker | Phase 1 Final Report |
| | poster_KSM2008_v2.ppt | manage | 1037.5 K | 01 Nov 2008 - 01:13 | DavidLM | PSF reconstruction poster |